内页资讯banner
资讯中心
News
内页资讯banner
资讯中心
News
Enterprise News

Aluminum alloy decorative profiles

Surface Treatment Engineering Technology Research and R&D Center

Information disclosure of environmental impact report (Draft) of Guangdong yaoyinshan Aluminum Co., Ltd
Font size:SMB

Guangdong yaoyinshan Aluminum Industry Co., Ltd. plans to construct the reconstruction and expansion project. According to the law of the people's Republic of China on environmental impact assessment, measures for public participation in environmental impact assessment and other relevant provisions, the environmental impact report of Guangdong yaoyinshan Aluminum Co., Ltd. reconstruction and expansion project (Draft) is published in full to solicit public opinions on the environmental impact of the construction project.

1、 Name and summary of construction project

(1) Project Name: Reconstruction and expansion project of Guangdong yaoyinshan Aluminum Industry Co., Ltd;

(2) Construction site: No. 33-35, Changgang Road, Genghe Town, Gaoming District, Foshan City;

(3) Construction scale: the current project of Guangdong yaoyinshan Aluminum Industry Co., Ltd. has an annual output of 50000 tons of aluminum profiles. According to the development plan of the enterprise, it is planned to adjust the layout on the basis of the existing projects, and expand the newly added aluminum profiles of about 48000 tons / year, the newly added aluminum sulfate products of 9000 tons / year, and the aluminum hydroxide products of 1500 tons / year.

2、 The way and way to link the full text of the draft of environmental impact report on the Internet and access to the paper report

The Internet link of the full text of the draft is shown in Annex 1; the paper report of the draft can be consulted directly from Guangdong yaoyinshan Aluminum Co., Ltd., the construction unit, and its address and contact information are shown below.

3、 Construction unit and contact information

Construction unit: Guangdong yaoyinshan Aluminum Industry Co., Ltd;

Contact person: Mr. Liang; Tel: 0757-88844666 / 88844388

Fax: 0757-88843366

E-mail: yaoyinshan@yys-alu.com

Address: no.33-35, Changgang Road, Genghe Town, Gaoming District, Foshan City. Postcode: 528522.

4、 Internet links to public opinion forms

The public opinion form can be downloaded from Annex 2 of this publication.

5、 Starting and ending time of public opinions

The feedback time of public opinions is from October 26 to November 6, 2020.

6、 Main issues for public opinion

(1) Overall view and attitude towards the project;

(2) What is your opinion on the regional location of the project;

(3) What are your major environmental concerns;

(4) Whether the construction of the project affects the surrounding environment quality;

(5) From the perspective of environmental protection, what is your attitude towards the project;

(6) Suggestions and requirements for the construction of the project and its environmental impact and mitigation measures.

Please reflect the above options and relevant contents to the construction unit or evaluation unit.

7、 People to be consulted

Enterprises and institutions, social organizations and the people near the project site.

8、 Ways of public opinion

During the publicity period, if you have any opinions or suggestions, you can contact the construction unit of the project by telephone, fax, mail, letter, etc.


Guangdong yaoyinshan Aluminum Industry Co., Ltd

October 26, 2020


Updated:2020-10-30 | Return
This article keywords:

Online
Service